ITAC Assessment: ME0102
ITAC logo
ITAC Assessment: ME0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Machine Components
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 140,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,195 1,201,055
kWh
Fuel Oil #2 $13,071 3,882
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,046 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $486 $90 $486
5,275
kWh
-
02 2.2437: Recover waste heat from equipment $3,485 $8,690 $3,485
37,808
kWh
-
03 2.4133: Use most efficient type of electric motors $3,038 $7,200 $3,038
33,705
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,674 $1,400 - $1,674
-
MMBtu
05 2.3212: Optimize plant power factor $1,363 - $1,363
14,947
kWh
-
TOTAL RECOMMENDED $10,046 $17,380 $8,372
91,735
kWh
$1,674
-
MMBtu
TOTAL IMPLEMENTED $4,712 $8,600 $3,038
33,705
kWh
$1,674
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs