ITAC Assessment: UL0128
ITAC logo
ITAC Assessment: UL0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Food processing equipment
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 150,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,141 4,336,753
kWh
Natural Gas $52,310 13,056
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,956 $1,721 n/a $1,956
45,721
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $687 $1,000 n/a - $687
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,597 $2,650 n/a $1,597
37,222
kWh
-
04 2.3212: Optimize plant power factor $5,045 $6,400 n/a $5,045
-
kWh
-
05 2.3212: Optimize plant power factor $7,271 $6,758 n/a $7,271
-
kWh
-
TOTAL RECOMMENDED $16,556 $18,529 $15,869
82,943
kWh
$687
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs