ITAC Assessment: ME0101
ITAC logo
ITAC Assessment: ME0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Audio Cassettes
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,187 3,283,118
kWh
Fuel Oil #6 $19,800 9,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $4,898 $900 $4,898
28,136
kWh
02 2.2511: Insulate bare equipment $5,551 $1,690 $5,551
32,825
kWh
03 2.4131: Size electric motors for peak operating efficiency $201 $1,344 $201
2,345
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,648 $736 $2,648
25,791
kWh
05 2.8123: Pay utility bills on time $2,554 - $2,554
-
kWh
TOTAL RECOMMENDED $15,852 $4,670 $15,852
89,097
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs