Assessment Year | 2022 |
---|---|
Principal Product | Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $10 M to 50M |
# of Employees | 14 |
Plant Area |
108,000
ft2
|
Annual Production | 2,700,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $762,456 | 4,879,200 |
kWh
|
$0.16 |
Electricity Demand | $161,442 | 13,496 |
kW-mo/yr
|
$11.96 |
Electricity Fees | $22,176 | - |
|
- |
Natural Gas | $41,148 | 5,085 |
MMBtu
|
$8.09 |
TOTAL YEARLY COSTS | $987,222 | |||
RECOMMENDED SAVINGS* | $312,126 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $625 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $128,837 | $757,936 |
$94,085
602,037
kWh
|
$167
-
kW-mo/yr
|
- | $34,585 | - | |
02 | 2.7261: Install timers and/or thermostats | $1,343 | $2,860 | - | - |
$1,343
-
MMBtu
|
- | - | |
03 | 3.4132: Use deionized water in upstream rinse tanks | $103,500 | $219,500 | - | - | - | - | $103,500 | |
04 | 2.7313: Recycle air for heating, ventilation and air conditioning | $1,133 | $1,000 | - | - |
$1,133
-
MMBtu
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $56,228 | $127,450 |
$(-53,296.0)
(-341,640)
kWh
|
$(-5,598.0)
-
kW-mo/yr
|
- | - | $115,122 | |
06 | 2.7234: Use heat pump for space conditioning | $10,538 | $3,700 |
$9,533
61,112
kWh
|
$1,005
-
kW-mo/yr
|
- | - | - | |
07 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $625 | $966 |
$458
2,934
kWh
|
$167
-
kW-mo/yr
|
- | - | - | |
08 | 2.6124: Establish equipment maintenance schedule | $9,922 | $11,600 |
$8,199
52,560
kWh
|
$1,723
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $312,126 | $1,125,012 |
$58,979
377,003
kWh
|
$(-2,536.0)
-
kW-mo/yr
|
$2,476
-
MMBtu
|
$34,585 | $218,622 | ||
TOTAL IMPLEMENTED | $625 | $966 |
$458
2,934
kWh
|
$167
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs