ITAC Assessment: MA0847
ITAC logo
ITAC Assessment: MA0847
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 108,000
ft2
Annual Production 2,700,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $762,456 4,879,200
kWh
Electricity Demand $161,442 13,496
kW-mo/yr
Electricity Fees $22,176 -
Natural Gas $41,148 5,085
MMBtu
TOTAL YEARLY COSTS $987,222
RECOMMENDED SAVINGS* $312,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $128,837 $757,936 $94,085
602,037
kWh
$167
-
kW-mo/yr
- $34,585 -
02 2.7261: Install timers and/or thermostats $1,343 $2,860 - - $1,343
-
MMBtu
- -
03 3.4132: Use deionized water in upstream rinse tanks $103,500 $219,500 - - - - $103,500
04 2.7313: Recycle air for heating, ventilation and air conditioning $1,133 $1,000 - - $1,133
-
MMBtu
- -
05 2.4322: Use or replace with energy efficient substitutes $56,228 $127,450 $(-53,296.0)
(-341,640)
kWh
$(-5,598.0)
-
kW-mo/yr
- - $115,122
06 2.7234: Use heat pump for space conditioning $10,538 $3,700 $9,533
61,112
kWh
$1,005
-
kW-mo/yr
- - -
07 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $625 $966 $458
2,934
kWh
$167
-
kW-mo/yr
- - -
08 2.6124: Establish equipment maintenance schedule $9,922 $11,600 $8,199
52,560
kWh
$1,723
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $312,126 $1,125,012 $58,979
377,003
kWh
$(-2,536.0)
-
kW-mo/yr
$2,476
-
MMBtu
$34,585 $218,622
TOTAL IMPLEMENTED $625 $966 $458
2,934
kWh
$167
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs