ITAC Assessment: SF0459
ITAC logo
ITAC Assessment: SF0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dairy Products
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range greater than $500
M
# of Employees 385
Plant Area 532,000
ft2
Annual Production 565,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,369,461 47,652,816
kWh
Electricity Demand $1,416,794 79,727
kW-mo/yr
Natural Gas $1,972,634 282,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $674,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $356,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.2113: Repair or replace steam traps $29,918 $5,047 - - - $29,918
-
MMBtu
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $391 - $2,011
27,428
kWh
- - - - $(-1,620.0) - - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $196,316 $40,788 $196,316
2,677,157
kWh
- - - - - - - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $41,206 $19,989 $30,936
421,878
kWh
$10,270
-
kW-mo/yr
- - - - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,624 $15,013 $23,624
322,159
kWh
- - - - - - - -
06 2.1243: Use heat from boiler blowdown to preheat boiler feed water $23,360 $14,429 - - - $23,360
-
MMBtu
- - - - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,292 $1,945 - - - $3,292
-
MMBtu
- - - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $16,977 $11,607 $12,823
174,872
kWh
$4,154
-
kW-mo/yr
- - - - - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,959 $6,271 $7,959
108,536
kWh
- - - - - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,935 $5,491 $5,935
80,929
kWh
- - - - - - - -
11 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $17,754 $22,786 $17,754
242,115
kWh
- - - - - - - -
12 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $58,197 $81,522 $43,693
595,834
kWh
$14,504
-
kW-mo/yr
- - - - - - -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $14,158 $24,030 $6,545
92,254
kWh
$4,545
-
kW-mo/yr
- - - - $672 $2,396 -
14 2.1233: Analyze flue gas for proper air/fuel ratio $42,975 $82,916 $7,989
108,950
kWh
- - $34,986
-
MMBtu
- - - - -
15 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,707 $39,862 $14,707
200,554
kWh
- - - - - - - -
16 2.7135: Install occupancy sensors $6,651 $23,688 $3,879
52,901
kWh
$2,772
-
kW-mo/yr
- - - - - - -
17 3.4111: Use closed cycle process to minimize waste water production $166,472 $100,519 $(-660.0)
(-9,005)
kWh
$(-246.0)
-
kW-mo/yr
- - $118,452
-
Tgal
- - - $48,926
-
Tgal
18 2.3137: Use power during off-peak periods $5,106 - - $3,853
-
kW-mo/yr
$1,253 - - - - - -
TOTAL RECOMMENDED $674,998 $495,903 $373,511
5,096,562
kWh
$39,852
-
kW-mo/yr
$1,253 $91,556
-
MMBtu
$118,452
-
Tgal
$(-1,620.0) $672 $2,396 $48,926
-
Tgal
TOTAL IMPLEMENTED $356,517 $333,194 $77,332
1,057,576
kWh
$18,803
-
kW-mo/yr
- $91,556
-
MMBtu
$118,452
-
Tgal
$(-1,620.0) $672 $2,396 $48,926
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs