ITAC Assessment: MA0786
ITAC logo
ITAC Assessment: MA0786
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Melted beverages - beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 100,000
ft2
Annual Production 100,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $357,336 4,316,000
kWh
Electricity Demand $128,666 9,299
kW-mo/yr
Electricity Fees $2,661 -
Natural Gas $306,464 36,176
MMBtu
Waste Disposal Costs
Water Usage $156,328 22,677
Tgal
Water Disposal $390,084 21,607
Tgal
TOTAL YEARLY COSTS $1,341,539
RECOMMENDED SAVINGS* $59,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,650 $11,256 $36,650
441,563
kWh
-
02 2.2437: Recover waste heat from equipment $10,389 $13,527 $6,004
72,340
kWh
$4,385
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,232 $1,000 $7,232
87,135
kWh
-
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $4,126 $500 $672
8,093
kWh
$3,454
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $542 $1,820 - $542
-
MMBtu
06 2.7261: Install timers and/or thermostats $559 $360 $17
208
kWh
$542
-
MMBtu
TOTAL RECOMMENDED $59,498 $28,463 $50,575
609,339
kWh
$8,923
-
MMBtu
TOTAL IMPLEMENTED $7,791 $1,360 $7,249
87,343
kWh
$542
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs