| Assessment Year | 2015 |
|---|---|
| Principal Product | Complex aerospace components |
| NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $50 M to 100M |
| # of Employees | 177 |
| Plant Area |
83,000
ft2
|
| Annual Production | 1,200
pieces
|
| Production Hrs. Annual | 6,300
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $321,861 | 3,560,400 |
kWh
|
$0.090 |
| Electricity Demand | $98,601 | 8,958 |
kW-mo/yr
|
$11.01 |
| Electricity Fees | $4,800 | - |
|
- |
| Natural Gas | $16,711 | 1,040 |
MMBtu
|
$16.07 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,165 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $10,197 | $27,500 |
$8,744
96,725
kWh
|
$1,453
-
kW-mo/yr
|
- | |
| 02 | 2.3212: Optimize plant power factor | $8,840 | $12,155 | - |
$8,840
-
kW-mo/yr
|
- | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,413 | $39,000 |
$9,216
101,950
kWh
|
$2,521
-
kW-mo/yr
|
$(-3,324.0)
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,325 | $1,800 |
$5,325
58,902
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,753 | $3,460 |
$1,046
11,572
kWh
|
- |
$1,707
-
MMBtu
|
|
| 06 | 2.7314: Reduce ventilation air | $2,077 | $500 |
$630
6,969
kWh
|
- |
$1,447
-
MMBtu
|
|
| TOTAL RECOMMENDED | $37,605 | $84,415 |
$24,961
276,118
kWh
|
$12,814
-
kW-mo/yr
|
$(-170.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,165 | $13,955 |
$5,325
58,902
kWh
|
$8,840
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs