ITAC Assessment: MA0744
ITAC logo
ITAC Assessment: MA0744
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Complex aerospace components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 177
Plant Area 83,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 6,300
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $321,861 3,560,400
kWh
Electricity Demand $98,601 8,958
kW-mo/yr
Electricity Fees $4,800 -
Natural Gas $16,711 1,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $10,197 $27,500 $8,744
96,725
kWh
$1,453
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $8,840 $12,155 - $8,840
-
kW-mo/yr
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,413 $39,000 $9,216
101,950
kWh
$2,521
-
kW-mo/yr
$(-3,324.0)
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,325 $1,800 $5,325
58,902
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,753 $3,460 $1,046
11,572
kWh
- $1,707
-
MMBtu
06 2.7314: Reduce ventilation air $2,077 $500 $630
6,969
kWh
- $1,447
-
MMBtu
TOTAL RECOMMENDED $37,605 $84,415 $24,961
276,118
kWh
$12,814
-
kW-mo/yr
$(-170.0)
-
MMBtu
TOTAL IMPLEMENTED $14,165 $13,955 $5,325
58,902
kWh
$8,840
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs