ITAC Assessment: MA0743
ITAC logo
ITAC Assessment: MA0743
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Assembled Systems
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 46,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,195 1,138,768
kWh
Electricity Demand $11,181 2,781
kW-mo/yr
Electricity Fees $9,218 -
Natural Gas $35,600 2,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,748 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,215

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $17,665 $2,500 $14,912
124,058
kWh
- $2,753
-
MMBtu
02 2.8121: Apply for tax-free status for energy purchases $8,215 $500 - $8,215 -
03 2.7221: Lower temperature during the winter season and vice-versa $3,749 $1,426 $1,088
7,961
kWh
- $2,661
-
MMBtu
04 2.7135: Install occupancy sensors $406 $980 $406
3,375
kWh
- -
05 2.4224: Upgrade controls on compressors $373 $500 $373
2,421
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $340 $300 $340
2,824
kWh
- -
TOTAL RECOMMENDED $30,748 $6,206 $17,119
140,639
kWh
$8,215 $5,414
-
MMBtu
TOTAL IMPLEMENTED $8,215 $500 - $8,215 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs