ITAC Assessment: MA0706
ITAC logo
ITAC Assessment: MA0706
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Plastic film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 36,000
ft2
Annual Production 29,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $898,172 9,049,300
kWh
Electricity Demand $58,408 14,900
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $1,129 102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $9,814 $10,900 $9,814
98,832
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,037 $6,900 $4,037
40,650
kWh
-
03 2.2691: Shut off cooling if cold outside air will cool process $4,016 $26,000 $4,016
40,451
kWh
-
04 2.7261: Install timers and/or thermostats $1,105 $100 $928
9,350
kWh
$177
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $864 $300 $864
8,705
kWh
-
06 2.7135: Install occupancy sensors $350 $450 $350
3,618
kWh
-
TOTAL RECOMMENDED $20,186 $44,650 $20,009
201,606
kWh
$177
-
MMBtu
TOTAL IMPLEMENTED $14,935 $37,000 $14,758
148,633
kWh
$177
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs