ITAC Assessment: UU0169
ITAC logo
ITAC Assessment: UU0169
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Water Distribution
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 13,500
ft2
Annual Production 7,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,807 5,054,406
kWh
Electricity Demand $74,608 10,752
kW-mo/yr
Electricity Fees $38,546 -
TOTAL YEARLY COSTS $282,961
RECOMMENDED SAVINGS* $69,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,976 $124,680 $31,140
929,551
kWh
$8,836
-
kW-mo/yr
02 2.3322: Use existing dam to generate electricity $24,451 $120,000 $13,210
394,445
kWh
$11,241
-
kW-mo/yr
03 2.2211: Use optimum temperature $4,303 - $3,341
99,734
kWh
$961
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $514 $2,100 $406
12,100
kWh
$108
-
kW-mo/yr
TOTAL RECOMMENDED $69,244 $246,780 $48,097
1,435,830
kWh
$21,147
-
kW-mo/yr
TOTAL IMPLEMENTED $44,792 $126,780 $34,887
1,041,385
kWh
$9,905
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs