Assessment Year | 2012 |
---|---|
Principal Product | Drinking water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 9 |
Plant Area |
35,000
ft2
|
Annual Production | 1,150,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $239,833 | 1,906,450 |
kWh
|
$0.13 |
Electricity Demand | $35,523 | 4,386 |
kW-mo/yr
|
$8.10 |
Electricity Fees | $270 | - |
|
- |
Fuel Oil #2 | $95,019 | 3,497 |
MMBtu
|
$27.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,227 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $8,300 | $1,000 |
$8,300
66,100
kWh
|
- | - | |
02 | 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa | $8,226 | $6,500 |
$8,226
65,396
kWh
|
- | - | |
03 | 2.7226: Use computer programs to optimize hvac performance | $7,992 | $28,000 |
$4,487
35,665
kWh
|
$3,505
-
MMBtu
|
- | |
04 | 2.5194: Redesign process | $7,448 | $22,500 |
$2,557
20,327
kWh
|
- |
$4,891
-
lb
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,082 | $4,410 |
$5,082
40,401
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,103 | $5,900 |
$2,103
16,717
kWh
|
- | - | |
07 | 2.4131: Size electric motors for peak operating efficiency | $2,076 | $9,870 |
$2,076
16,500
kWh
|
- | - | |
TOTAL RECOMMENDED | $41,227 | $78,180 |
$32,831
261,106
kWh
|
$3,505
-
MMBtu
|
$4,891
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs