ITAC Assessment: MA0689
ITAC logo
ITAC Assessment: MA0689
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Printed wireboard
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 724,338
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,910,332 21,582,040
kWh
Electricity Demand $401,244 51,199
kW-mo/yr
Natural Gas $586,319 109,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $209,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $160,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $85,000 $250,000 $38,576
433,440
kWh
- $46,424
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $32,036 $4,000 $32,036
359,952
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,784 $5,000 $19,784
222,289
kWh
- -
04 2.2211: Use optimum temperature $13,757 $8,000 $7,565
84,996
kWh
- $6,192
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,785 $3,000 $10,785
121,180
kWh
- -
06 2.2437: Recover waste heat from equipment $7,905 $12,000 - - $7,905
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,677 $9,750 $7,677
86,261
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,958 $9,500 $6,958
78,175
kWh
- -
09 2.2211: Use optimum temperature $5,818 $900 $4,706
52,871
kWh
- $1,112
-
MMBtu
10 2.7124: Make a practice of turning off lights when not needed $5,139 $5,200 $3,822
42,942
kWh
$1,317
-
kW-mo/yr
-
11 2.4231: Reduce the pressure of compressed air to the minimum required $4,144 $1,000 $4,144
46,559
kWh
- -
12 2.6212: Turn off equipment during breaks, reduce operating time $2,245 $1,500 $2,245
25,228
kWh
- -
13 2.7124: Make a practice of turning off lights when not needed $2,032 $700 $2,032
22,830
kWh
- -
14 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,657 $6,000 $1,657
18,620
kWh
- -
15 2.2511: Insulate bare equipment $1,579 $2,300 - - $1,579
-
MMBtu
16 2.6212: Turn off equipment during breaks, reduce operating time $1,244 $1,000 $1,244
13,977
kWh
- -
17 2.7442: Keep doors and windows shut when not on use $1,042 $500 - - $1,042
-
MMBtu
18 2.6212: Turn off equipment during breaks, reduce operating time $717 $200 $717
8,059
kWh
- -
TOTAL RECOMMENDED $209,519 $320,550 $143,948
1,617,379
kWh
$1,317
-
kW-mo/yr
$64,254
-
MMBtu
TOTAL IMPLEMENTED $160,963 $289,050 $103,297
1,160,632
kWh
$1,317
-
kW-mo/yr
$56,349
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs