ITAC Assessment: MA0684
ITAC logo
ITAC Assessment: MA0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Flat tissue paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 80,000
ft2
Annual Production 21,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,380,000 21,262,000
kWh
Fuel Oil #6 $206,288 11,970
MMBtu
Wood $770,216 237,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Wood Savings
01 2.2437: Recover waste heat from equipment $23,122 $40,000 $(-766.0)
(-6,962)
kWh
$4,221
-
MMBtu
$19,667
-
MMBtu
02 2.7314: Reduce ventilation air $14,891 $3,700 $3,531
32,101
kWh
$2,016
-
MMBtu
$9,344
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,358 $15,000 $11,358
103,254
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,744 - $5,744
52,220
kWh
- -
05 2.4224: Upgrade controls on compressors $3,360 $10,625 $3,360
30,549
kWh
- -
06 2.7135: Install occupancy sensors $2,502 $2,200 $2,502
22,741
kWh
- -
07 2.2511: Insulate bare equipment $1,402 $2,100 - $258
-
MMBtu
$1,144
-
MMBtu
TOTAL RECOMMENDED $62,379 $73,625 $25,729
233,903
kWh
$6,495
-
MMBtu
$30,155
-
MMBtu
TOTAL IMPLEMENTED $53,275 $63,000 $16,625
151,134
kWh
$6,495
-
MMBtu
$30,155
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs