Assessment Year | 2011 |
---|---|
Principal Product | Flat tissue paper |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
80,000
ft2
|
Annual Production | 21,000
ton
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,380,000 | 21,262,000 |
kWh
|
$0.11 |
Fuel Oil #6 | $206,288 | 11,970 |
MMBtu
|
$17.23 |
Wood | $770,216 | 237,467 |
MMBtu
|
$3.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,379 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,275 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $23,122 | $40,000 |
$(-766.0)
(-6,962)
kWh
|
$4,221
-
MMBtu
|
$19,667
-
MMBtu
|
|
02 | 2.7314: Reduce ventilation air | $14,891 | $3,700 |
$3,531
32,101
kWh
|
$2,016
-
MMBtu
|
$9,344
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,358 | $15,000 |
$11,358
103,254
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,744 | - |
$5,744
52,220
kWh
|
- | - | |
05 | 2.4224: Upgrade controls on compressors | $3,360 | $10,625 |
$3,360
30,549
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $2,502 | $2,200 |
$2,502
22,741
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $1,402 | $2,100 | - |
$258
-
MMBtu
|
$1,144
-
MMBtu
|
|
TOTAL RECOMMENDED | $62,379 | $73,625 |
$25,729
233,903
kWh
|
$6,495
-
MMBtu
|
$30,155
-
MMBtu
|
||
TOTAL IMPLEMENTED | $53,275 | $63,000 |
$16,625
151,134
kWh
|
$6,495
-
MMBtu
|
$30,155
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs