| Assessment Year | 2012 |
|---|---|
| Principal Product | Pharmaceuticals |
| NAICS | 325412: Pharmaceutical Preparation Manufacturing |
| SIC | 2836: Biological Products, Except Diagnostic Substances |
| Sales Range | greater than $500 M |
| # of Employees | 2,300 |
| Plant Area |
872,000
ft2
|
| Annual Production | 9,450
Tgal
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,145,041 | 93,563,480 |
kWh
|
$0.034 |
| Electricity Demand | $2,333,921 | 152,918 |
kW-mo/yr
|
$15.26 |
| Electricity Fees | $651,725 | - |
|
- |
| Natural Gas | $1,983,889 | 378,705 |
MMBtu
|
$5.24 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,449,569 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $43,250 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1241: Reduce excessive boiler blowdown | $1,179 | - | - | - |
$1,179
-
MMBtu
|
- | - | |
| 02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $11,916 | $18,000 | - | - |
$11,916
-
MMBtu
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,336 | $1,200 | - | - |
$1,336
-
MMBtu
|
- | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $671 | $1,100 | - | - |
$671
-
MMBtu
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,091 | $400 |
$3,190
94,920
kWh
|
$1,901
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.2437: Recover waste heat from equipment | $35,967 | $85,750 | - | - |
$35,967
-
MMBtu
|
- | - | |
| 07 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $12,321 | $36,400 |
$400
11,913
kWh
|
- |
$11,921
-
MMBtu
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,181 | $151,669 |
$19,240
572,451
kWh
|
$19,941
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,234 | $33,182 |
$4,478
133,241
kWh
|
$2,669
-
kW-mo/yr
|
- | - | $2,087 | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $883 | $1,575 |
$259
7,695
kWh
|
$359
-
kW-mo/yr
|
- | - | $265 | |
| 11 | 3.3128: Utilize other methods to remove contaminants | $1,331,790 | $2,000,000 |
$(-5,888.0)
(-175,200)
kWh
|
$(-3,365.0)
-
kW-mo/yr
|
$(-16,537.0)
-
MMBtu
|
$1,357,580
-
lb
|
- | |
| TOTAL RECOMMENDED | $1,449,569 | $2,329,276 |
$21,679
645,020
kWh
|
$21,505
-
kW-mo/yr
|
$46,453
-
MMBtu
|
$1,357,580
-
lb
|
$2,352 | ||
| TOTAL IMPLEMENTED | $43,250 | $155,544 |
$19,499
580,146
kWh
|
$20,300
-
kW-mo/yr
|
$3,186
-
MMBtu
|
- | $265 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs