ITAC Assessment: MA0676
ITAC logo
ITAC Assessment: MA0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product cold rolling, hardening and tempering, slitting, edging, and electron be
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 375,000
ft2
Annual Production 2,400,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,047,591 7,944,575
kWh
Electricity Demand $452,712 37,826
kW-mo/yr
Electricity Fees $(-31,031.0) -
Natural Gas $432,331 49,242
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $233,727 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $206,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $204,367 $98,845 - $204,367
-
kW-mo/yr
-
02 2.4323: Use optimum size and capacity equipment $24,027 $4,000 $24,027
196,944
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $3,019 $500 $3,019
24,749
kWh
- -
04 2.2511: Insulate bare equipment $1,721 $2,750 - - $1,721
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $593 $1,250 $593
4,860
kWh
- -
TOTAL RECOMMENDED $233,727 $107,345 $27,639
226,553
kWh
$204,367
-
kW-mo/yr
$1,721
-
MMBtu
TOTAL IMPLEMENTED $206,681 $102,845 $593
4,860
kWh
$204,367
-
kW-mo/yr
$1,721
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs