ITAC Assessment: MA0675
ITAC logo
ITAC Assessment: MA0675
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 125,000
ft2
Annual Production 29,200
ton
Production Hrs. Annual 8,590
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,789,361 21,390,000
kWh
Electricity Demand $563,175 48,036
kW-mo/yr
Electricity Fees $32,000 -
Fuel Oil #6 $2,718,521 203,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,359 $42,800 $22,359
235,360
kWh
-
02 2.4226: Use / purchase optimum sized compressor $13,761 $66,000 $13,761
144,849
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,132 $23,800 $7,132
75,073
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,736 $23,800 $5,736
60,376
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,422 $23,800 $5,422
57,069
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,677 $12,300 $3,677
38,706
kWh
-
07 2.2511: Insulate bare equipment $2,590 $950 - $2,590
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,713 $6,600 $1,713
18,301
kWh
-
TOTAL RECOMMENDED $62,390 $200,050 $59,800
629,734
kWh
$2,590
-
MMBtu
TOTAL IMPLEMENTED $2,590 $950 - $2,590
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs