ITAC Assessment: ME0228
ITAC logo
ITAC Assessment: ME0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product frozen potatoes
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 13,500
ft2
Annual Production 190,006,000
lb
Production Hrs. Annual 7,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,925 3,414,420
kWh
Electricity Demand $60,047 6,240
kW-mo/yr
Electricity Fees $4,551 -
LPG $175,471 19,488
MMBtu
Fuel Oil #2 $89,365 15,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
01 4.211: Consider use / purchase of bulk materials where possible $58,961 $46,000 - - - - $58,961 -
02 2.2443: Re-use or recycle hot or cold process exhaust air $14,209 $23,600 - - $14,209
-
MMBtu
- - -
03 2.2135: Repair and eliminate steam leaks $5,656 $857 - - - $5,614
-
MMBtu
- $42
-
Tgal
04 2.4133: Use most efficient type of electric motors $4,459 $10,908 $3,571
41,325
kWh
$888
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,340 $2,721 $1,859
41,325
kWh
$481
-
kW-mo/yr
- - - -
06 4.821: Pay bills on time to avoid late fees $3,664 - - - - - $3,664 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,710 $300 $1,710
26,377
kWh
- - - - -
08 3.4151: Minimize water usage $6,304 $19,800 $69
879
kWh
- - $5,968
-
MMBtu
- $267
-
Tgal
09 3.4151: Minimize water usage $1,949 $232 - - - - - $1,949
-
Tgal
TOTAL RECOMMENDED $99,252 $104,418 $7,209
109,906
kWh
$1,369
-
kW-mo/yr
$14,209
-
MMBtu
$11,582
-
MMBtu
$62,625 $2,258
-
Tgal
TOTAL IMPLEMENTED $85,043 $80,818 $7,209
109,906
kWh
$1,369
-
kW-mo/yr
- $11,582
-
MMBtu
$62,625 $2,258
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs