| Assessment Year | 2009 |
|---|---|
| Principal Product | Linear edge saw blades |
| NAICS | 332216: Saw Blade and Handtool Manufacturing |
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $50 M to 100M |
| # of Employees | 188 |
| Plant Area |
280,000
ft2
|
| Annual Production | 20,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,130,681 | 9,091,558 |
kWh
|
$0.12 |
| Electricity Demand | $72,528 | 20,035 |
kW-mo/yr
|
$3.62 |
| Electricity Fees | $117,356 | - |
|
- |
| Natural Gas | $94,837 | 7,118 |
MMBtu
|
$13.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $213,713 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,655 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $30,103 | $31,813 | - | - |
$30,103
-
MMBtu
|
|
| 02 | 2.4239: Eliminate or reduce compressed air usage | $54,137 | $59,160 |
$51,712
414,030
kWh
|
$2,425
-
kW-mo/yr
|
- | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $36,829 | $50,000 |
$34,885
279,302
kWh
|
$1,944
-
kW-mo/yr
|
- | |
| 04 | 2.4323: Use optimum size and capacity equipment | $36,798 | $150,000 |
$35,393
283,868
kWh
|
$1,405
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $36,052 | $6,000 |
$36,052
288,646
kWh
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,937 | $15,375 |
$13,937
109,552
kWh
|
- | - | |
| 07 | 2.2514: Cover open tanks | $5,857 | $1,924 |
$5,857
46,896
kWh
|
- | - | |
| TOTAL RECOMMENDED | $213,713 | $314,272 |
$177,836
1,422,294
kWh
|
$5,774
-
kW-mo/yr
|
$30,103
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $42,655 | $151,924 |
$41,250
330,764
kWh
|
$1,405
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs