ITAC Assessment: MA0640
ITAC logo
ITAC Assessment: MA0640
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Semiconductors
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 437
Plant Area 160,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 5,228
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,725,540 13,025,400
kWh
Electricity Demand $178,335 29,430
kW-mo/yr
Electricity Fees $840 -
Natural Gas $222,698 18,335
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7314: Reduce ventilation air $36,692 $39,000 $25,587
198,015
kWh
- $11,105
-
MMBtu
-
02 2.3212: Optimize plant power factor $11,811 $11,850 - $11,811
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $11,640 $43,000 $11,640
87,842
kWh
- - -
04 3.4151: Minimize water usage $4,210 $18,000 - - - $4,210
-
Tgal
05 2.7261: Install timers and/or thermostats $1,895 $3,000 - - $1,895
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $977 - $876
6,610
kWh
$101
-
kW-mo/yr
- -
07 2.2136: Install / repair insulation on steam lines $644 $689 - - $644
-
MMBtu
-
TOTAL RECOMMENDED $67,869 $115,539 $38,103
292,467
kWh
$11,912
-
kW-mo/yr
$13,644
-
MMBtu
$4,210
-
Tgal
TOTAL IMPLEMENTED $52,019 $54,539 $26,463
204,625
kWh
$11,912
-
kW-mo/yr
$13,644
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs