ITAC Assessment: IA0462
ITAC logo
ITAC Assessment: IA0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Aseptically Packaged Products
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $50
M
to 100
M
# of Employees 112
Plant Area 171,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $364,113 6,865,806
kWh
Electricity Demand $159,217 36,690
kW-mo/yr
Natural Gas $820,110 145,580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,158 $15,702 $8,502
160,400
kWh
$1,656
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,704 $16,590 $10,179
192,020
kWh
$1,525
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,818 $1,530 $2,818
53,153
kWh
- -
04 2.2628: Utilize a less expensive cooling method $59,656 $20,000 $59,656
1,125,600
kWh
- -
05 2.2437: Recover waste heat from equipment $15,983 $25,000 - - $15,983
-
MMBtu
06 2.4239: Eliminate or reduce compressed air usage $1,698 $240 $1,208
22,800
kWh
$490
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,593 $250 $6,689
126,216
kWh
$904
-
kW-mo/yr
-
08 2.2612: Use cooling tower water instead of refrigeration $22,774 $1,500 $22,774
429,696
kWh
- -
09 2.2442: Preheat combustion air with waste heat $3,450 $1,000 - - $3,450
-
MMBtu
10 2.6212: Turn off equipment during breaks, reduce operating time $1,518 $200 $1,518
28,646
kWh
- -
TOTAL RECOMMENDED $137,352 $82,012 $113,344
2,138,531
kWh
$4,575
-
kW-mo/yr
$19,433
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs