ITAC Assessment: MA0618
ITAC logo
ITAC Assessment: MA0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product glass bulbs
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 600,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 8,341
hrs
Location (State) Rhode Island
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,667,831 21,769,461
kWh
Electricity Demand $107,099 34,919
kW-mo/yr
Electricity Fees $(-14,827.0) -
Natural Gas $1,983,124 194,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,879 $79,554 $46,191
401,662
kWh
$1,688
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,820 $26,621 $31,664
275,340
kWh
$1,156
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $12,316 $3,220 - - $12,316
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,204 $29,875 $11,772
102,363
kWh
$432
-
kW-mo/yr
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,589 $17,740 $15,456
134,400
kWh
$526
-
kW-mo/yr
$(-5,393.0)
-
MMBtu
06 2.2511: Insulate bare equipment $7,795 $1,924 $7,795
67,779
kWh
- -
07 2.3212: Optimize plant power factor $4,906 $18,500 - $4,906
-
kW-mo/yr
-
08 2.7261: Install timers and/or thermostats $4,125 $3,552 $1,086
9,445
kWh
- $3,039
-
MMBtu
09 2.2611: Moderate cooling tower outlet temperature $1,070 $340 - - $1,070
-
MMBtu
TOTAL RECOMMENDED $133,704 $181,326 $113,964
990,989
kWh
$8,708
-
kW-mo/yr
$11,032
-
MMBtu
TOTAL IMPLEMENTED $133,704 $181,326 $113,964
990,989
kWh
$8,708
-
kW-mo/yr
$11,032
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs