ITAC Assessment: MA0605
ITAC logo
ITAC Assessment: MA0605
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Healtcare devices
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $100
M
to 500
M
# of Employees 730
Plant Area 450,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $551,911 9,250,800
kWh
Electricity Demand $116,260 20,361
kW-mo/yr
Electricity Fees $5,550 -
Natural Gas $248,802 22,760
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $46,780 $18,225 - $46,780
-
MMBtu
02 2.7261: Install timers and/or thermostats $17,280 $975 - $17,280
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $2,515 - $2,515
45,600
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,754 $525 $1,754
34,000
kWh
-
TOTAL RECOMMENDED $68,329 $19,725 $4,269
79,600
kWh
$64,060
-
MMBtu
TOTAL IMPLEMENTED $21,549 $1,500 $4,269
79,600
kWh
$17,280
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs