Assessment Year | 2006 |
---|---|
Principal Product | Light conveyor belting |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 127 |
Plant Area |
200,000
ft2
|
Annual Production | 1,300
thousand feet
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $479,969 | 7,576,603 |
kWh
|
$0.063 |
Electricity Demand | $107,506 | 20,595 |
kW-mo/yr
|
$5.22 |
Electricity Fees | $3,000 | - |
|
- |
Natural Gas | $575,581 | 70,420 |
MMBtu
|
$8.17 |
LPG | $7,244 | 45 |
MMBtu
|
$160.98 |
Fuel Oil #4 | $202,741 | 25,128 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $239,891 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $182,407 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $123,147 | $15,525 | - | - |
$123,147
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,354 | $121,835 |
$46,368
579,600
kWh
|
$2,986
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $40,484 | $141,413 |
$(-2,016.0)
(-25,200)
kWh
|
- |
$42,500
-
MMBtu
|
- | |
04 | 2.2113: Repair or replace steam traps | $11,241 | $7,665 | - | - |
$6,201
-
MMBtu
|
$5,040
-
MMBtu
|
|
05 | 2.7314: Reduce ventilation air | $5,860 | $3,505 |
$1,248
15,600
kWh
|
- |
$4,612
-
MMBtu
|
- | |
06 | 2.2625: Chill water to the highest temperature possible | $4,046 | - |
$4,046
50,576
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $3,159 | $5,681 | - | - |
$3,159
-
MMBtu
|
- | |
08 | 2.4131: Size electric motors for peak operating efficiency | $2,600 | $500 |
$2,600
32,326
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $239,891 | $296,124 |
$52,246
652,902
kWh
|
$2,986
-
kW-mo/yr
|
$179,619
-
MMBtu
|
$5,040
-
MMBtu
|
||
TOTAL IMPLEMENTED | $182,407 | $140,865 |
$51,662
645,776
kWh
|
$2,986
-
kW-mo/yr
|
$127,759
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs