ITAC Assessment: MA0594
ITAC logo
ITAC Assessment: MA0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Light conveyor belting
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 127
Plant Area 200,000
ft2
Annual Production 1,300
thousand feet
Production Hrs. Annual 6,257
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,969 7,576,603
kWh
Electricity Demand $107,506 20,595
kW-mo/yr
Electricity Fees $3,000 -
Natural Gas $575,581 70,420
MMBtu
LPG $7,244 45
MMBtu
Fuel Oil #4 $202,741 25,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $239,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $182,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.7261: Install timers and/or thermostats $123,147 $15,525 - - $123,147
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $49,354 $121,835 $46,368
579,600
kWh
$2,986
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $40,484 $141,413 $(-2,016.0)
(-25,200)
kWh
- $42,500
-
MMBtu
-
04 2.2113: Repair or replace steam traps $11,241 $7,665 - - $6,201
-
MMBtu
$5,040
-
MMBtu
05 2.7314: Reduce ventilation air $5,860 $3,505 $1,248
15,600
kWh
- $4,612
-
MMBtu
-
06 2.2625: Chill water to the highest temperature possible $4,046 - $4,046
50,576
kWh
- - -
07 2.2511: Insulate bare equipment $3,159 $5,681 - - $3,159
-
MMBtu
-
08 2.4131: Size electric motors for peak operating efficiency $2,600 $500 $2,600
32,326
kWh
- - -
TOTAL RECOMMENDED $239,891 $296,124 $52,246
652,902
kWh
$2,986
-
kW-mo/yr
$179,619
-
MMBtu
$5,040
-
MMBtu
TOTAL IMPLEMENTED $182,407 $140,865 $51,662
645,776
kWh
$2,986
-
kW-mo/yr
$127,759
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs