ITAC Assessment: NC0428
ITAC logo
ITAC Assessment: NC0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Foam insulation
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 500,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,404 5,472,454
kWh
Electricity Demand $299,212 10,246
kW-mo/yr
Electricity Fees $2,113 -
Natural Gas $36,029 3,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $295,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $145,527 $450,915 $18,786
299,377
kWh
$194,671
-
kW-mo/yr
$1,962
-
MMBtu
$(-69,892.0)
-
MMBtu
- - -
02 4.424: Improve space comfort conditioning $60,444 $94,425 $(-7,844.0)
(-125,000)
kWh
$(-6,762.0)
-
kW-mo/yr
- - - $(-1,000.0) $76,050
03 2.7142: Utilize higher efficiency lamps and/or ballasts $72,294 $287,294 $42,622
697,236
kWh
$36,747
-
kW-mo/yr
- - - $(-7,075.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,540 $13,050 $1,648
26,257
kWh
$1,892
-
kW-mo/yr
- - - - -
05 2.7135: Install occupancy sensors $307 $750 $307
4,890
kWh
- - - - - -
06 2.3113: Make ice during off peak hours for cooling $7,730 $47,000 - $7,730
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,910 $25 $2,638
42,038
kWh
$2,272
-
kW-mo/yr
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $681 $100 $527
8,400
kWh
$454
-
kW-mo/yr
- - $(-180.0) $(-120.0) -
TOTAL RECOMMENDED $295,433 $893,559 $58,684
953,198
kWh
$237,004
-
kW-mo/yr
$1,962
-
MMBtu
$(-69,892.0)
-
MMBtu
$(-180.0) $(-8,195.0) $76,050
TOTAL IMPLEMENTED $227,259 $752,134 $66,528
1,078,198
kWh
$236,036
-
kW-mo/yr
$1,962
-
MMBtu
$(-69,892.0)
-
MMBtu
$(-180.0) $(-7,195.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs