Assessment Year | 2005 |
---|---|
Principal Product | metal boxes and storage cabinets, plastic first aid kits |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 257 |
Plant Area |
120,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,975
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,435 | 3,921,764 |
kWh
|
$0.074 |
Electricity Demand | $96,935 | 20,712 |
kW-mo/yr
|
$4.68 |
Electricity Fees | $8,768 | - |
|
- |
LPG | $236,294 | 21,929 |
MMBtu
|
$10.78 |
Fuel Oil #2 | $92,221 | 11,600 |
MMBtu
|
$7.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,405 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,928 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,080 | $82,975 |
$29,040
382,100
kWh
|
$6,040
-
kW-mo/yr
|
- | - | |
02 | 2.5196: Use small number of high output units instead of many small inefficient units | $20,245 | $77,830 |
$16,755
220,467
kWh
|
$3,490
-
kW-mo/yr
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $26,565 | $37,830 |
$13,435
176,800
kWh
|
$4,411
-
kW-mo/yr
|
$8,719
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,411 | $1,650 |
$6,134
80,704
kWh
|
$1,277
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $5,675 | $1,820 |
$3,360
44,223
kWh
|
$2,315
-
kW-mo/yr
|
- | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $5,143 | $12,500 |
$5,143
67,673
kWh
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $2,354 | $5,390 | - | - | - |
$2,354
-
MMBtu
|
|
08 | 2.7221: Lower temperature during the winter season and vice-versa | $3,780 | $5,264 | - | - | - |
$3,780
-
MMBtu
|
|
09 | 2.4322: Use or replace with energy efficient substitutes | $1,152 | $260 |
$867
11,411
kWh
|
$285
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $107,405 | $225,519 |
$74,734
983,378
kWh
|
$17,818
-
kW-mo/yr
|
$8,719
-
MMBtu
|
$6,134
-
MMBtu
|
||
TOTAL IMPLEMENTED | $50,928 | $64,454 |
$28,072
369,400
kWh
|
$8,003
-
kW-mo/yr
|
$8,719
-
MMBtu
|
$6,134
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs