ITAC Assessment: MA0590
ITAC logo
ITAC Assessment: MA0590
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 400,000
ft2
Annual Production 85,000,000
lb
Production Hrs. Annual 7,500
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,144,824 36,095,134
kWh
Electricity Demand $289,504 6,440
kW-mo/yr
Natural Gas $211,793 16,868
MMBtu
LPG $42,612 2,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $23,037 $56,931 $21,676
411,300
kWh
$1,361
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,269 $30,445 $9,908
188,000
kWh
$1,361
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,393 $12,255 $6,393
121,300
kWh
- -
04 2.6218: Turn off equipment when not in use $3,100 $3,295 $3,100
58,900
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,630 $7,000 $1,630
31,200
kWh
- -
06 2.2437: Recover waste heat from equipment $16,603 $3,312 - - $16,603
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,408 $1,000 $1,257
23,900
kWh
$151
-
kW-mo/yr
-
08 2.7243: Improve air circulation with destratification fans / other methods $29,100 $25,000 $(-1,250.0)
(-24,000)
kWh
$(-150.0)
-
kW-mo/yr
$30,500
-
MMBtu
09 2.2511: Insulate bare equipment $10,500 $2,000 $10,500
199,700
kWh
- -
10 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $9,818 $6,420 $8,900
169,200
kWh
$918
-
kW-mo/yr
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $8,286 $21,300 $6,080
115,600
kWh
$2,206
-
kW-mo/yr
-
TOTAL RECOMMENDED $121,144 $168,958 $68,194
1,295,100
kWh
$5,847
-
kW-mo/yr
$47,103
-
MMBtu
TOTAL IMPLEMENTED $61,366 $69,663 $42,333
804,100
kWh
$2,430
-
kW-mo/yr
$16,603
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs