ITAC Assessment: MA0587
ITAC logo
ITAC Assessment: MA0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Molds for plastic injection industry
NAICS 333511: Industrial Mold Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 62
Plant Area 53,215
ft2
Annual Production 250
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,471 1,434,600
kWh
Electricity Demand $42,834 3,929
kW-mo/yr
Natural Gas $11,940 887
MMBtu
Fuel Oil #2 $400 35
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,567

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $32,448 $600 - - - $32,448
02 2.8112: Combine utility meters $4,300 $15,675 - - $4,300 -
03 2.7241: Install outside air damper / economizer on hvac unit $875 $1,210 $875
11,600
kWh
- - -
04 2.7135: Install occupancy sensors $1,022 $1,520 $1,022
13,560
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $580 $452 $430
5,700
kWh
$150
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $392 $900 $392
5,200
kWh
- - -
TOTAL RECOMMENDED $39,617 $20,357 $2,719
36,060
kWh
$150
-
kW-mo/yr
$4,300 $32,448
TOTAL IMPLEMENTED $5,567 $17,785 $1,267
16,800
kWh
- $4,300 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs