ITAC Assessment: MA0586
ITAC logo
ITAC Assessment: MA0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Electro-plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 22,000
ft2
Annual Production 3,500
lb
Production Hrs. Annual 4,680
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,837 1,232,400
kWh
Electricity Demand $32,297 3,801
kW-mo/yr
Electricity Fees $(-20,966.0) -
Natural Gas $84,399 9,294
MMBtu
Fuel Oil #2 $56,448 7,609
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,190 - - $3,190
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $3,081 $140 $1,862
25,200
kWh
$1,219
-
kW-mo/yr
- -
03 3.4154: Eliminate leaks in water lines and valves $3,200 - - - $2,200
-
MMBtu
$1,000
-
Tgal
04 2.6231: Utilize controls to operate equipment only when needed $2,415 $350 $2,415
32,675
kWh
- - -
05 2.8112: Combine utility meters $1,736 $1,950 - - $1,736
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $841 $1,646 $480
6,500
kWh
- $361
-
MMBtu
-
07 2.7135: Install occupancy sensors $443 $1,395 $443
6,002
kWh
- - -
TOTAL RECOMMENDED $14,906 $5,481 $5,200
70,377
kWh
$4,409
-
kW-mo/yr
$4,297
-
MMBtu
$1,000
-
Tgal
TOTAL IMPLEMENTED $9,301 $5,131 $2,785
37,702
kWh
$1,219
-
kW-mo/yr
$4,297
-
MMBtu
$1,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs