ITAC Assessment: MA0583
ITAC logo
ITAC Assessment: MA0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Machined and ground shafts, rods, pins, and other round components
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 25,444
ft2
Annual Production 210,000
pieces
Production Hrs. Annual 5,772
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,608 607,520
kWh
Electricity Demand $13,368 2,022
kW-mo/yr
Natural Gas $8,676 651
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,565 $29,567 $3,900
47,600
kWh
$665
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $4,360 $1,180 $3,670
44,730
kWh
$690
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $4,215 - $3,790
46,250
kWh
$425
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $1,148 - $980
11,970
kWh
$168
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $826 - $186
2,265
kWh
- $640
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $228 - $194
2,370
kWh
$34
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $105 $296 $91
1,110
kWh
$14
-
kW-mo/yr
-
08 2.2437: Recover waste heat from equipment $79 $318 - - $79
-
MMBtu
TOTAL RECOMMENDED $15,526 $31,361 $12,811
156,295
kWh
$1,996
-
kW-mo/yr
$719
-
MMBtu
TOTAL IMPLEMENTED $15,526 $31,361 $12,811
156,295
kWh
$1,996
-
kW-mo/yr
$719
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs