ITAC Assessment: UD0098
ITAC logo
ITAC Assessment: UD0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product KNIT GOODS
NAICS
n/a
SIC 2254: Knit Underwear and Nightwear Mills
Sales Range $10
M
to 50
M
# of Employees 306
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 5,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,986 2,186,108
kWh
Natural Gas $369,243 68,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $37,152 $36,000 $(-228.0)
(-5,569)
kWh
$37,380
-
MMBtu
02 2.7494: Install storm windows and doors $9,286 $8,000 - $9,286
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $992 $590 $1,083
22,860
kWh
$(-91.0)
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $6,313 $11,424 - $6,313
-
MMBtu
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,383 - $2,383
-
kWh
-
TOTAL RECOMMENDED $56,126 $56,014 $3,238
17,291
kWh
$52,888
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs