ITAC Assessment: LM0044
ITAC logo
ITAC Assessment: LM0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product tools
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 92,000
ft2
Annual Production 357,500
pieces
Production Hrs. Annual 2,040
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,980 893,580
kWh
Electricity Demand $32,018 3,900
kW-mo/yr
Electricity Fees $830 -
Natural Gas $3,987 635
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $410,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $235,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,025 $625 $4,169
34,849
kWh
$1,636
-
kW-mo/yr
$(-780.0) - - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,530 $3,825 $2,458
20,545
kWh
$1,072
-
kW-mo/yr
- - - - -
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $5,678 $2,120 $3,533
29,534
kWh
$2,145
-
kW-mo/yr
- - - - -
04 4.322: Eliminate old stock and modify inventory control $14,885 - - - - - - $14,885 -
05 4.214: Purchase appropriately sized material $216,000 $3,400 - - - - $216,000 - -
06 4.625: Develop standard operating procedures $159,315 $6,792 - - - - - - $159,315
07 4.454: Modify startup/shutdown times $5,695 $300 - $7,825
-
kW-mo/yr
$(-20,250.0) $18,120 - - -
TOTAL RECOMMENDED $410,128 $17,062 $10,160
84,928
kWh
$12,678
-
kW-mo/yr
$(-21,030.0) $18,120 $216,000 $14,885 $159,315
TOTAL IMPLEMENTED $235,910 $4,025 $4,169
34,849
kWh
$1,636
-
kW-mo/yr
$(-780.0) - $216,000 $14,885 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings By-product Production Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs