ITAC Assessment: MA0581
ITAC logo
ITAC Assessment: MA0581
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Axel Seals
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 208
Plant Area 38,100
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,706 7,762,400
kWh
Electricity Demand $80,640 16,066
kW-mo/yr
Electricity Fees $13,078 -
Natural Gas $214,030 23,311
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $425,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $165,668 $1,327,403 $434,553
4,938,100
kWh
$27,245
-
kW-mo/yr
$(-316,244.0)
-
MMBtu
$20,114
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $81,700 $18,200 $25,890
294,200
kWh
- $55,810
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $72,480 $157,905 $65,340
742,500
kWh
$7,140
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $30,652 $18,550 $27,632
314,000
kWh
$3,020
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $20,531 $17,435 $28,758
326,800
kWh
$2,240
-
kW-mo/yr
$(-10,467.0)
-
MMBtu
-
06 2.4226: Use / purchase optimum sized compressor $12,002 $29,888 $8,237
93,600
kWh
$3,765
-
kW-mo/yr
- -
07 2.2223: Enhance sensitivity of temperature control and cutoff $10,812 $5,328 $1,496
17,000
kWh
- $9,316
-
MMBtu
-
08 2.2437: Recover waste heat from equipment $10,675 $4,675 - - $10,675
-
MMBtu
-
09 2.7224: Reduce space conditioning during non-working hours $9,508 $160 - - $9,508
-
MMBtu
-
10 2.2223: Enhance sensitivity of temperature control and cutoff $5,166 $3,100 $5,166
58,700
kWh
- - -
11 2.2612: Use cooling tower water instead of refrigeration $3,467 $8,300 $3,397
38,600
kWh
$70
-
kW-mo/yr
- -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,134 $6,429 $2,834
32,200
kWh
$300
-
kW-mo/yr
- -
TOTAL RECOMMENDED $425,795 $1,597,373 $603,303
6,855,700
kWh
$43,780
-
kW-mo/yr
$(-241,402.0)
-
MMBtu
$20,114
TOTAL IMPLEMENTED $151,980 $58,313 $63,581
722,500
kWh
$3,090
-
kW-mo/yr
$85,309
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs