| Assessment Year | 2005 |
|---|---|
| Principal Product | Plastic auto parts |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 181 |
| Plant Area |
345,000
ft2
|
| Annual Production | 1,165,000
pieces
|
| Production Hrs. Annual | 3,624
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,280,846 | 15,519,170 |
kWh
|
$0.083 |
| Electricity Demand | $349,483 | 46,645 |
kW-mo/yr
|
$7.49 |
| Electricity Fees | $55,829 | - |
|
- |
| LPG | $896,300 | 98,726 |
MMBtu
|
$9.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $197,823 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $129,142 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $86,353 | $20,000 | - |
$86,353
-
kW-mo/yr
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,684 | $4,800 |
$1,043
12,480
kWh
|
- |
$12,641
-
MMBtu
|
|
| 03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,767 | $25,000 |
$4,767
58,273
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $318 | $327 |
$401
4,600
kWh
|
- |
$(-83.0)
-
MMBtu
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,718 | $5,475 |
$1,307
15,663
kWh
|
$411
-
kW-mo/yr
|
- | |
| 06 | 2.1116: Improve combustion control capability | $36,304 | $600 | - | - |
$36,304
-
MMBtu
|
|
| 07 | 2.7261: Install timers and/or thermostats | $54,679 | $800 | - | - |
$54,679
-
MMBtu
|
|
| TOTAL RECOMMENDED | $197,823 | $57,002 |
$7,518
91,016
kWh
|
$86,764
-
kW-mo/yr
|
$103,541
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $129,142 | $51,075 |
$6,074
73,936
kWh
|
$86,764
-
kW-mo/yr
|
$36,304
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs