ITAC Assessment: MA0578
ITAC logo
ITAC Assessment: MA0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Plastic auto parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 181
Plant Area 345,000
ft2
Annual Production 1,165,000
pieces
Production Hrs. Annual 3,624
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,280,846 15,519,170
kWh
Electricity Demand $349,483 46,645
kW-mo/yr
Electricity Fees $55,829 -
LPG $896,300 98,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $129,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $86,353 $20,000 - $86,353
-
kW-mo/yr
-
02 2.6212: Turn off equipment during breaks, reduce operating time $13,684 $4,800 $1,043
12,480
kWh
- $12,641
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $4,767 $25,000 $4,767
58,273
kWh
- -
04 2.2511: Insulate bare equipment $318 $327 $401
4,600
kWh
- $(-83.0)
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,718 $5,475 $1,307
15,663
kWh
$411
-
kW-mo/yr
-
06 2.1116: Improve combustion control capability $36,304 $600 - - $36,304
-
MMBtu
07 2.7261: Install timers and/or thermostats $54,679 $800 - - $54,679
-
MMBtu
TOTAL RECOMMENDED $197,823 $57,002 $7,518
91,016
kWh
$86,764
-
kW-mo/yr
$103,541
-
MMBtu
TOTAL IMPLEMENTED $129,142 $51,075 $6,074
73,936
kWh
$86,764
-
kW-mo/yr
$36,304
-