ITAC Assessment: MA0576
ITAC logo
ITAC Assessment: MA0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Aerospace omponents
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 480
Plant Area 210,000
ft2
Annual Production 800,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $930,239 8,420,400
kWh
Electricity Demand $274,184 17,816
kW-mo/yr
Electricity Fees $14,446 -
LPG $275,200 43,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,323

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.7261: Install timers and/or thermostats $33,608 $2,000 - - $33,608
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,240 $3,120 $15,358
286,000
kWh
$1,882
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,578 $7,342 $2,578
48,000
kWh
- -
04 2.2437: Recover waste heat from equipment $2,505 $4,283 - - $2,505
-
MMBtu
TOTAL RECOMMENDED $55,931 $16,745 $17,936
334,000
kWh
$1,882
-
kW-mo/yr
$36,113
-
MMBtu
TOTAL IMPLEMENTED $22,323 $14,745 $17,936
334,000
kWh
$1,882
-
kW-mo/yr
$2,505
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs