Assessment Year | 2005 |
---|---|
Principal Product | Aerospace omponents |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 480 |
Plant Area |
210,000
ft2
|
Annual Production | 800,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $930,239 | 8,420,400 |
kWh
|
$0.11 |
Electricity Demand | $274,184 | 17,816 |
kW-mo/yr
|
$15.39 |
Electricity Fees | $14,446 | - |
|
- |
LPG | $275,200 | 43,705 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,931 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,323 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $33,608 | $2,000 | - | - |
$33,608
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,240 | $3,120 |
$15,358
286,000
kWh
|
$1,882
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,578 | $7,342 |
$2,578
48,000
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $2,505 | $4,283 | - | - |
$2,505
-
MMBtu
|
|
TOTAL RECOMMENDED | $55,931 | $16,745 |
$17,936
334,000
kWh
|
$1,882
-
kW-mo/yr
|
$36,113
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,323 | $14,745 |
$17,936
334,000
kWh
|
$1,882
-
kW-mo/yr
|
$2,505
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs