| Assessment Year | 2005 |
|---|---|
| Principal Product | Coated paper, film and fabric foil |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
250,000
ft2
|
| Annual Production | 125,000,000
lb
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $753,630 | 28,061,142 |
kWh
|
$0.027 |
| Electricity Demand | $673,930 | 43,400 |
kW-mo/yr
|
$15.53 |
| Electricity Fees | $38,244 | - |
|
- |
| Natural Gas | $370,100 | 31,300 |
MMBtu
|
$11.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $123,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $64,414 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $34,944 | $79,014 |
$(-1,666.0)
(-25,800)
kWh
|
- |
$36,610
-
MMBtu
|
|
| 02 | 2.2511: Insulate bare equipment | $27,226 | $1,624 |
$27,226
613,200
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $20,028 | $21,736 |
$(-1,399.0)
(-31,800)
kWh
|
- |
$21,427
-
MMBtu
|
|
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,182 | $20,800 |
$13,182
296,900
kWh
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,127 | $30,357 |
$11,127
250,600
kWh
|
- | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,432 | $32,499 |
$29,224
658,200
kWh
|
$19,158
-
kW-mo/yr
|
$(-38,950.0)
-
MMBtu
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,365 | - |
$1,590
35,800
kWh
|
$775
-
kW-mo/yr
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $2,708 | $7,000 |
$2,708
61,000
kWh
|
- | - | |
| 09 | 2.2625: Chill water to the highest temperature possible | $1,891 | $200 |
$1,891
42,600
kWh
|
- | - | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $960 | $600 |
$960
21,600
kWh
|
- | - | |
| TOTAL RECOMMENDED | $123,863 | $193,830 |
$84,843
1,922,300
kWh
|
$19,933
-
kW-mo/yr
|
$19,087
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $64,414 | $61,317 |
$42,212
950,400
kWh
|
$775
-
kW-mo/yr
|
$21,427
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs