ITAC Assessment: MA0548
ITAC logo
ITAC Assessment: MA0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aluminum anodizing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 25,000
ft2
Annual Production 1,312,500
pieces
Production Hrs. Annual 6,552
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,729 1,944,960
kWh
Electricity Demand $50,282 5,972
kW-mo/yr
Natural Gas $112,000 13,000
MMBtu
Fuel Oil #2 $33,215 4,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,665

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $13,881 $4,244 $3,614
57,800
kWh
- $10,267
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,950 $4,150 $9,950
159,200
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $7,609 $19,680 n/a - - $7,609
-
MMBtu
04 2.2511: Insulate bare equipment $4,665 $1,100 - - $4,665
-
MMBtu
05 2.7261: Install timers and/or thermostats $1,528 $1,625 - - $1,528
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $699 $3,574 $699
11,200
kWh
- -
07 2.2437: Recover waste heat from equipment $653 $200 $537
7,900
kWh
$116
-
kW-mo/yr
-
08 2.7314: Reduce ventilation air $607 $1,831 - - $607
-
MMBtu
09 2.7111: Reduce illumination to minimum necessary levels $414 $200 $340
5,000
kWh
$74
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,006 $36,604 $15,140
241,100
kWh
$190
-
kW-mo/yr
$24,676
-
MMBtu
TOTAL IMPLEMENTED $4,665 $1,100 - - $4,665
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs