Assessment Year | 2004 |
---|---|
Principal Product | Aluminum anodizing |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
25,000
ft2
|
Annual Production | 1,312,500
pieces
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $120,729 | 1,944,960 |
kWh
|
$0.062 |
Electricity Demand | $50,282 | 5,972 |
kW-mo/yr
|
$8.42 |
Natural Gas | $112,000 | 13,000 |
MMBtu
|
$8.62 |
Fuel Oil #2 | $33,215 | 4,900 |
MMBtu
|
$6.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,665 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $13,881 | $4,244 |
$3,614
57,800
kWh
|
- |
$10,267
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,950 | $4,150 |
$9,950
159,200
kWh
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $7,609 | $19,680 | n/a | - | - |
$7,609
-
MMBtu
|
04 | 2.2511: Insulate bare equipment | $4,665 | $1,100 | - | - |
$4,665
-
MMBtu
|
|
05 | 2.7261: Install timers and/or thermostats | $1,528 | $1,625 | - | - |
$1,528
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $699 | $3,574 |
$699
11,200
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $653 | $200 |
$537
7,900
kWh
|
$116
-
kW-mo/yr
|
- | |
08 | 2.7314: Reduce ventilation air | $607 | $1,831 | - | - |
$607
-
MMBtu
|
|
09 | 2.7111: Reduce illumination to minimum necessary levels | $414 | $200 |
$340
5,000
kWh
|
$74
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $40,006 | $36,604 |
$15,140
241,100
kWh
|
$190
-
kW-mo/yr
|
$24,676
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,665 | $1,100 | - | - |
$4,665
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs