ITAC Assessment: MA0545
ITAC logo
ITAC Assessment: MA0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Medium to heavy metal gauge plate products
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 69,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,070
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,632 761,602
kWh
Electricity Demand $23,124 3,408
kW-mo/yr
Electricity Fees $799 -
Natural Gas $21,800 2,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,190 - - $2,190
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $1,737 $2,750 - - $1,737
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $867 $340 $867
11,100
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $601 - $601
7,700
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $219 - $219
2,800
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $199 $795 $199
2,550
kWh
- -
TOTAL RECOMMENDED $5,813 $3,885 $1,886
24,150
kWh
$2,190
-
kW-mo/yr
$1,737
-
MMBtu
TOTAL IMPLEMENTED $5,813 $3,885 $1,886
24,150
kWh
$2,190
-
kW-mo/yr
$1,737
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs