Assessment Year | 2003 |
---|---|
Principal Product | Medium to heavy metal gauge plate products |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
69,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,070
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $62,632 | 761,602 |
kWh
|
$0.082 |
Electricity Demand | $23,124 | 3,408 |
kW-mo/yr
|
$6.79 |
Electricity Fees | $799 | - |
|
- |
Natural Gas | $21,800 | 2,536 |
MMBtu
|
$8.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,813 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,190 | - | - |
$2,190
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $1,737 | $2,750 | - | - |
$1,737
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $867 | $340 |
$867
11,100
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $601 | - |
$601
7,700
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $219 | - |
$219
2,800
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $199 | $795 |
$199
2,550
kWh
|
- | - | |
TOTAL RECOMMENDED | $5,813 | $3,885 |
$1,886
24,150
kWh
|
$2,190
-
kW-mo/yr
|
$1,737
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,813 | $3,885 |
$1,886
24,150
kWh
|
$2,190
-
kW-mo/yr
|
$1,737
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs