ITAC Assessment: MA0526
ITAC logo
ITAC Assessment: MA0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Nitrile and Latex Gloves
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 275,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $380,681 3,652,020
kWh
Electricity Demand $62,372 12,474
kW-mo/yr
Electricity Fees $22,154 -
LPG $14,767 1,288
MMBtu
Fuel Oil #6 $162,252 32,174
MMBtu
Wood $516,181 248,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,169

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.1113: Reduce combustion air flow to optimum $29,601 $51,300 n/a $8,038
169,944
kWh
$21,563
-
MMBtu
02 2.2437: Recover waste heat from equipment $20,577 $40,000 - $20,577
-
MMBtu
03 2.2511: Insulate bare equipment $5,194 $5,150 n/a - $5,194
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,324 $11,500 n/a $4,324
91,413
kWh
-
05 2.2511: Insulate bare equipment $3,638 $6,300 - $3,638
-
MMBtu
06 2.6231: Utilize controls to operate equipment only when needed $3,179 $2,970 $3,179
67,200
kWh
-
07 2.7221: Lower temperature during the winter season and vice-versa $1,169 - $68
1,432
kWh
$1,101
-
MMBtu
08 2.7135: Install occupancy sensors $1,138 $600 $1,138
24,064
kWh
-
TOTAL RECOMMENDED $68,820 $117,820 $16,747
354,053
kWh
$52,073
-
MMBtu
TOTAL IMPLEMENTED $1,169 - $68
1,432
kWh
$1,101
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs