Assessment Year | 2002 |
---|---|
Principal Product | Nitrile and Latex Gloves |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
110,000
ft2
|
Annual Production | 275,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $380,681 | 3,652,020 |
kWh
|
$0.10 |
Electricity Demand | $62,372 | 12,474 |
kW-mo/yr
|
$5.00 |
Electricity Fees | $22,154 | - |
|
- |
LPG | $14,767 | 1,288 |
MMBtu
|
$11.47 |
Fuel Oil #6 | $162,252 | 32,174 |
MMBtu
|
$5.04 |
Wood | $516,181 | 248,946 |
MMBtu
|
$2.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,169 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $29,601 | $51,300 | n/a |
$8,038
169,944
kWh
|
$21,563
-
MMBtu
|
02 | 2.2437: Recover waste heat from equipment | $20,577 | $40,000 | - |
$20,577
-
MMBtu
|
|
03 | 2.2511: Insulate bare equipment | $5,194 | $5,150 | n/a | - |
$5,194
-
MMBtu
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,324 | $11,500 | n/a |
$4,324
91,413
kWh
|
- |
05 | 2.2511: Insulate bare equipment | $3,638 | $6,300 | - |
$3,638
-
MMBtu
|
|
06 | 2.6231: Utilize controls to operate equipment only when needed | $3,179 | $2,970 |
$3,179
67,200
kWh
|
- | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $1,169 | - |
$68
1,432
kWh
|
$1,101
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $1,138 | $600 |
$1,138
24,064
kWh
|
- | |
TOTAL RECOMMENDED | $68,820 | $117,820 |
$16,747
354,053
kWh
|
$52,073
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,169 | - |
$68
1,432
kWh
|
$1,101
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs