Assessment Year | 2002 |
---|---|
Principal Product | Calcium metal |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 10 |
Plant Area |
40,000
ft2
|
Annual Production | 1,168,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,277 | 1,246,794 |
kWh
|
$0.070 |
LPG | $6,926 | 867 |
MMBtu
|
$7.99 |
Fuel Oil #2 | $310,829 | 43,229 |
MMBtu
|
$7.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,196 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $27,097 | $34,000 | - |
$27,097
-
MMBtu
|
|
02 | 2.1133: Adjust burners for efficient operation | $16,316 | $4,800 | - |
$16,316
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,066 | $7,675 |
$6,066
86,663
kWh
|
- | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $2,717 | $360 | - |
$2,717
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $311 | $1,000 |
$311
4,437
kWh
|
- | |
TOTAL RECOMMENDED | $52,507 | $47,835 |
$6,377
91,100
kWh
|
$46,130
-
MMBtu
|
||
TOTAL IMPLEMENTED | $52,196 | $46,835 |
$6,066
86,663
kWh
|
$46,130
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs