ITAC Assessment: MA0521
ITAC logo
ITAC Assessment: MA0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Calcium metal
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 40,000
ft2
Annual Production 1,168,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,277 1,246,794
kWh
LPG $6,926 867
MMBtu
Fuel Oil #2 $310,829 43,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $27,097 $34,000 - $27,097
-
MMBtu
02 2.1133: Adjust burners for efficient operation $16,316 $4,800 - $16,316
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,066 $7,675 $6,066
86,663
kWh
-
04 2.2443: Re-use or recycle hot or cold process exhaust air $2,717 $360 - $2,717
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $311 $1,000 $311
4,437
kWh
-
TOTAL RECOMMENDED $52,507 $47,835 $6,377
91,100
kWh
$46,130
-
MMBtu
TOTAL IMPLEMENTED $52,196 $46,835 $6,066
86,663
kWh
$46,130
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs