| Assessment Year | 2002 |
|---|---|
| Principal Product | Commercial Printing |
| NAICS |
n/a
|
| SIC | 2741: Miscellaneous Publishing |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
65,000
ft2
|
| Annual Production | 15,500,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $204,302 | 2,812,074 |
kWh
|
$0.073 |
| Electricity Demand | $129,572 | 15,344 |
kW-mo/yr
|
$8.44 |
| Electricity Fees | $4,236 | - |
|
- |
| LPG | $21,020 | 2,633 |
MMBtu
|
$7.98 |
| Fuel Oil #2 | $20,137 | 3,585 |
MMBtu
|
$5.62 |
| Other Energy | $84,836 | 9,285 |
MMBtu
|
$9.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $59,956 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,852 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Other Energy Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $40,968 | $200,000 |
$9,919
156,520
kWh
|
$43,645
-
kW-mo/yr
|
- | - |
$(-10,596.0)
-
MMBtu
|
$(-2,000.0) | |
| 02 | 2.2437: Recover waste heat from equipment | $4,996 | $5,000 | - | - |
$4,996
-
MMBtu
|
- | - | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,892 | - |
$1,896
29,915
kWh
|
- | - |
$2,996
-
MMBtu
|
- | - | |
| 04 | 2.7224: Reduce space conditioning during non-working hours | $4,569 | - |
$1,868
34,400
kWh
|
- | - |
$2,701
-
MMBtu
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $2,407 | - |
$1,652
26,061
kWh
|
$755
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,214 | $500 |
$1,214
19,163
kWh
|
- | - | - | - | - | |
| 07 | 2.8223: Add air shields to trucks to increase fuel mileage | $519 | $900 | - | - | - | - |
$519
-
MMBtu
|
- | |
| 08 | 2.7135: Install occupancy sensors | $214 | $262 |
$214
3,370
kWh
|
- | - | - | - | - | |
| 09 | 2.2136: Install / repair insulation on steam lines | $177 | $281 | - | - | - |
$177
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $59,956 | $206,943 |
$16,763
269,429
kWh
|
$44,400
-
kW-mo/yr
|
$4,996
-
MMBtu
|
$5,874
-
MMBtu
|
$(-10,077.0)
-
MMBtu
|
$(-2,000.0) | ||
| TOTAL IMPLEMENTED | $10,852 | $781 |
$4,978
83,478
kWh
|
- | - |
$5,874
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Other Energy Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs