ITAC Assessment: MA0514
ITAC logo
ITAC Assessment: MA0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Commercial Printing
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 65,000
ft2
Annual Production 15,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,302 2,812,074
kWh
Electricity Demand $129,572 15,344
kW-mo/yr
Electricity Fees $4,236 -
LPG $21,020 2,633
MMBtu
Fuel Oil #2 $20,137 3,585
MMBtu
Other Energy $84,836 9,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Other Energy Savings Personnel Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $40,968 $200,000 $9,919
156,520
kWh
$43,645
-
kW-mo/yr
- - $(-10,596.0)
-
MMBtu
$(-2,000.0)
02 2.2437: Recover waste heat from equipment $4,996 $5,000 - - $4,996
-
MMBtu
- - -
03 2.6212: Turn off equipment during breaks, reduce operating time $4,892 - $1,896
29,915
kWh
- - $2,996
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $4,569 - $1,868
34,400
kWh
- - $2,701
-
MMBtu
- -
05 2.7111: Reduce illumination to minimum necessary levels $2,407 - $1,652
26,061
kWh
$755
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $1,214 $500 $1,214
19,163
kWh
- - - - -
07 2.8223: Add air shields to trucks to increase fuel mileage $519 $900 - - - - $519
-
MMBtu
-
08 2.7135: Install occupancy sensors $214 $262 $214
3,370
kWh
- - - - -
09 2.2136: Install / repair insulation on steam lines $177 $281 - - - $177
-
MMBtu
- -
TOTAL RECOMMENDED $59,956 $206,943 $16,763
269,429
kWh
$44,400
-
kW-mo/yr
$4,996
-
MMBtu
$5,874
-
MMBtu
$(-10,077.0)
-
MMBtu
$(-2,000.0)
TOTAL IMPLEMENTED $10,852 $781 $4,978
83,478
kWh
- - $5,874
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs