Assessment Year | 2002 |
---|---|
Principal Product | Plastic tubing and coated fiberglass sleeving |
NAICS |
n/a
|
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $5 M to 10M |
# of Employees | 58 |
Plant Area |
100,000
ft2
|
Annual Production | 70,000
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,837 | 2,085,602 |
kWh
|
$0.071 |
Electricity Demand | $31,268 | 5,140 |
kW-mo/yr
|
$6.08 |
Electricity Fees | $4,673 | - |
|
- |
LPG | $4,697 | 380 |
MMBtu
|
$12.36 |
Fuel Oil #2 | $44,412 | 9,723 |
MMBtu
|
$4.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,386 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,871 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2212: Use minimum safe oven ventilation | $10,252 | $10,000 |
$10,000
128,206
kWh
|
- |
$252
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $2,583 | $10,000 | - | - |
$2,583
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,565 | - |
$2,565
32,889
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,070 | $1,000 |
$1,070
13,712
kWh
|
- | - | |
05 | 2.1331: Burn a less expensive grade of fuel | $680 | $5,000 |
$2,009
25,759
kWh
|
$(-1,329.0)
-
MMBtu
|
- | |
06 | 2.2122: Install / repair insulation on condensate lines | $236 | $500 | - | - |
$236
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,386 | $26,500 |
$15,644
200,566
kWh
|
$(-1,329.0)
-
MMBtu
|
$3,071
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,871 | $1,500 |
$3,635
46,601
kWh
|
- |
$236
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs