ITAC Assessment: MA0513
ITAC logo
ITAC Assessment: MA0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic tubing and coated fiberglass sleeving
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 100,000
ft2
Annual Production 70,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,837 2,085,602
kWh
Electricity Demand $31,268 5,140
kW-mo/yr
Electricity Fees $4,673 -
LPG $4,697 380
MMBtu
Fuel Oil #2 $44,412 9,723
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,871

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.2212: Use minimum safe oven ventilation $10,252 $10,000 $10,000
128,206
kWh
- $252
-
MMBtu
02 2.2437: Recover waste heat from equipment $2,583 $10,000 - - $2,583
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,565 - $2,565
32,889
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,070 $1,000 $1,070
13,712
kWh
- -
05 2.1331: Burn a less expensive grade of fuel $680 $5,000 $2,009
25,759
kWh
$(-1,329.0)
-
MMBtu
-
06 2.2122: Install / repair insulation on condensate lines $236 $500 - - $236
-
MMBtu
TOTAL RECOMMENDED $17,386 $26,500 $15,644
200,566
kWh
$(-1,329.0)
-
MMBtu
$3,071
-
MMBtu
TOTAL IMPLEMENTED $3,871 $1,500 $3,635
46,601
kWh
- $236
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs