| Assessment Year | 2002 |
|---|---|
| Principal Product | Ferrous Investment Castings |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 375 |
| Plant Area |
198,000
ft2
|
| Annual Production | 17,420,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $508,238 | 8,855,000 |
kWh
|
$0.057 |
| Electricity Demand | $159,280 | 17,930 |
kW-mo/yr
|
$8.88 |
| Electricity Fees | $4,958 | - |
|
- |
| LPG | $245,547 | 36,534 |
MMBtu
|
$6.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $70,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,297 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $38,408 | $75,000 |
$50,728
943,226
kWh
|
$14,466
-
kW-mo/yr
|
$(-26,786.0)
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $29,628 | $24,650 | - | - |
$29,628
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,153 | $1,000 |
$1,153
21,227
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,144 | $170 |
$1,144
21,069
kWh
|
- | - | |
| TOTAL RECOMMENDED | $70,333 | $100,820 |
$53,025
985,522
kWh
|
$14,466
-
kW-mo/yr
|
$2,842
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,297 | $1,170 |
$2,297
42,296
kWh
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs