ITAC Assessment: MA0512
ITAC logo
ITAC Assessment: MA0512
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ferrous Investment Castings
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area 198,000
ft2
Annual Production 17,420,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,238 8,855,000
kWh
Electricity Demand $159,280 17,930
kW-mo/yr
Electricity Fees $4,958 -
LPG $245,547 36,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $38,408 $75,000 $50,728
943,226
kWh
$14,466
-
kW-mo/yr
$(-26,786.0)
-
MMBtu
02 2.2437: Recover waste heat from equipment $29,628 $24,650 - - $29,628
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,153 $1,000 $1,153
21,227
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,144 $170 $1,144
21,069
kWh
- -
TOTAL RECOMMENDED $70,333 $100,820 $53,025
985,522
kWh
$14,466
-
kW-mo/yr
$2,842
-
MMBtu
TOTAL IMPLEMENTED $2,297 $1,170 $2,297
42,296
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs