ITAC Assessment: MA0511
ITAC logo
ITAC Assessment: MA0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bonded metals
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 79,700
ft2
Annual Production 3,800,000
lb
Production Hrs. Annual 2,750
hrs
Location (State) Massachusetts
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,917 2,797,600
kWh
Electricity Demand $97,878 11,864
kW-mo/yr
Electricity Fees $14,168 -
Natural Gas $91,335 7,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $38,495 $4,090 - $38,495
-
kW-mo/yr
- -
02 4.812: Apply for investment incentives $15,314 - - - - $15,314
03 2.7224: Reduce space conditioning during non-working hours $10,764 $14,100 $391
5,605
kWh
- $10,373
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,282 $6,950 $2,782
39,909
kWh
- - $1,500
05 2.4231: Reduce the pressure of compressed air to the minimum required $605 - $605
8,678
kWh
- - -
06 4.821: Pay bills on time to avoid late fees $483 - - - - $483
07 2.6218: Turn off equipment when not in use $249 - $33
477
kWh
- $216
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $86 $350 $86
1,232
kWh
- - -
TOTAL RECOMMENDED $70,278 $25,490 $3,897
55,901
kWh
$38,495
-
kW-mo/yr
$10,589
-
MMBtu
$17,297
TOTAL IMPLEMENTED $70,278 $25,490 $3,897
55,901
kWh
$38,495
-
kW-mo/yr
$10,589
-
MMBtu
$17,297
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs