ITAC Assessment: IA0426
ITAC logo
ITAC Assessment: IA0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Construction Equipment
NAICS 423810: Construction and Mining (except Oil Well) Machinery and Equipment Merchant Wholesalers
SIC 5082: Construction and Mining (Except Petroleum) Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 442
Plant Area 500,000
ft2
Annual Production 8,500
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,615,867 19,390,400
kWh
Electricity Demand $640,511 3,760
kW-mo/yr
Natural Gas $1,237,038 1,366,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,200 $10,307 $6,731
2,752,964
kWh
$10,469
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $678 $847 $678
30,820
kWh
- - - -
03 2.7144: Install spectral reflectors / delamp $3,565 $225 $1,232
56,028
kWh
$2,333
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,748 $2,450 $2,643
120,141
kWh
$4,105
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,526 $30 $1,771
80,522
kWh
$2,755
-
kW-mo/yr
- - -
06 2.8123: Pay utility bills on time $16,112 - - - - - $16,112
07 2.7444: Close holes and openings in building such as broken windows $4,743 $185 - - $4,743
-
MMBtu
- -
08 2.7311: Ventilation system to shut off when room is not in use $7,288 $3,550 $410
18,672
kWh
- $6,878
-
MMBtu
- -
09 2.7311: Ventilation system to shut off when room is not in use $4,110 $10,000 $852
38,710
kWh
- $3,258
-
MMBtu
- -
10 2.3212: Optimize plant power factor $64,666 $43,320 - - - - $64,666
11 3.5217: Reuse / recycle/ sell paper products $28,890 $8,900 - - - $28,890
-
lb
-
TOTAL RECOMMENDED $158,526 $79,814 $14,317
3,097,857
kWh
$19,662
-
kW-mo/yr
$14,879
-
MMBtu
$28,890
-
lb
$80,778
TOTAL IMPLEMENTED $77,936 $22,914 $11,284
2,959,953
kWh
$16,907
-
kW-mo/yr
$4,743
-
MMBtu
$28,890
-
lb
$16,112
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings