ITAC Assessment: MA0214
ITAC logo
ITAC Assessment: MA0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COATED COPPERWARE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $5
M
to 10
M
# of Employees 74
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,513 704,279
kWh
Natural Gas $17,694 2,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,258 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $588 $108 $588
5,275
kWh
- -
02 2.4133: Use most efficient type of electric motors $346 $652 $346
3,224
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $457 $482 $457
4,103
kWh
- -
04 2.1331: Burn a less expensive grade of fuel $5,411 - - $17,691
-
MMBtu
$(-12,280.0)
-
MMBtu
05 2.3512: De-energize excess transformer capacity $5,456 $5,690 $5,456
48,945
kWh
- -
TOTAL RECOMMENDED $12,258 $6,932 $6,847
61,547
kWh
$17,691
-
MMBtu
$(-12,280.0)
-
MMBtu
TOTAL IMPLEMENTED $12,258 $6,932 $6,847
61,547
kWh
$17,691
-
MMBtu
$(-12,280.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs