Assessment Year 2002
Principal Product Face and Paving Brick
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 167,070
ft2
Annual Production 51,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,834 4,962,960
kWh
Electricity Demand $93,046 12,000
kW-mo/yr
Electricity Fees $6,217 -
Natural Gas $1,112,460 191,905
MMBtu
LPG $6,013 444
MMBtu
Other Energy $6,980 231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
01 2.2437: Recover waste heat from equipment $21,321 $60,800 - - $21,321
-
MMBtu
-
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $18,790 $45,905 - - $18,790
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $4,396 - - - $4,396
-
MMBtu
-
04 2.6242: Minimize operation of equipment maintained in standby condition $3,396 $4,200 $3,396
57,645
kWh
- - -
05 2.2531: Re-size charging openings or add movable cover or door $2,790 $1,200 - - - $2,790
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $439 $1,600 $439
7,454
kWh
- - -
07 2.7135: Install occupancy sensors $230 $608 $230
3,898
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $161 $4,560 $125
2,115
kWh
$36
-
kW-mo/yr
- -
TOTAL RECOMMENDED $51,523 $118,873 $4,190
71,112
kWh
$36
-
kW-mo/yr
$44,507
-
MMBtu
$2,790
-
MMBtu
TOTAL IMPLEMENTED $29,811 $52,905 $3,835
65,099
kWh
- $23,186
-
MMBtu
$2,790
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs