Assessment Year | 2002 |
---|---|
Principal Product | Face and Paving Brick |
NAICS |
n/a
|
SIC | 3251: Brick and Structural Clay Tile |
Sales Range | $10 M to 50M |
# of Employees | 53 |
Plant Area |
167,070
ft2
|
Annual Production | 51,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $263,834 | 4,962,960 |
kWh
|
$0.053 |
Electricity Demand | $93,046 | 12,000 |
kW-mo/yr
|
$7.75 |
Electricity Fees | $6,217 | - |
|
- |
Natural Gas | $1,112,460 | 191,905 |
MMBtu
|
$5.80 |
LPG | $6,013 | 444 |
MMBtu
|
$13.54 |
Other Energy | $6,980 | 231 |
MMBtu
|
$30.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,811 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $21,321 | $60,800 | - | - |
$21,321
-
MMBtu
|
- | |
02 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $18,790 | $45,905 | - | - |
$18,790
-
MMBtu
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $4,396 | - | - | - |
$4,396
-
MMBtu
|
- | |
04 | 2.6242: Minimize operation of equipment maintained in standby condition | $3,396 | $4,200 |
$3,396
57,645
kWh
|
- | - | - | |
05 | 2.2531: Re-size charging openings or add movable cover or door | $2,790 | $1,200 | - | - | - |
$2,790
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $439 | $1,600 |
$439
7,454
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $230 | $608 |
$230
3,898
kWh
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $161 | $4,560 |
$125
2,115
kWh
|
$36
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $51,523 | $118,873 |
$4,190
71,112
kWh
|
$36
-
kW-mo/yr
|
$44,507
-
MMBtu
|
$2,790
-
MMBtu
|
||
TOTAL IMPLEMENTED | $29,811 | $52,905 |
$3,835
65,099
kWh
|
- |
$23,186
-
MMBtu
|
$2,790
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs