Assessment Year | 2002 |
---|---|
Principal Product | Silicon-Carbide Ceramic Wafer Holders |
NAICS |
n/a
|
SIC | 3297: Nonclay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 139 |
Plant Area |
134,699
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,501,662 | 18,980,471 |
kWh
|
$0.079 |
Natural Gas | $82,088 | 15,119 |
MMBtu
|
$5.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $131,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6242: Minimize operation of equipment maintained in standby condition | $55,391 | $74,250 |
$55,391
1,035,341
kWh
|
- | - | - | |
02 | 3.4159: Replace treated water with well / surface water | $37,920 | $18,500 | - | - | - |
$37,920
-
Tgal
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,893 | $55,300 |
$18,893
353,146
kWh
|
- | - | - | |
04 | 2.1331: Burn a less expensive grade of fuel | $13,130 | $25,484 | - |
$67,660
-
MMBtu
|
$(-54,530.0)
-
MMBtu
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $3,441 | $5,848 |
$5,315
99,345
kWh
|
- |
$(-1,874.0)
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,523 | $2,000 |
$2,523
47,158
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $131,298 | $181,382 |
$82,122
1,534,990
kWh
|
$67,660
-
MMBtu
|
$(-56,404.0)
-
MMBtu
|
$37,920
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Water Consumption Savings |