ITAC Assessment: MA0505
ITAC logo
ITAC Assessment: MA0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Silicon-Carbide Ceramic Wafer Holders
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 134,699
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,501,662 18,980,471
kWh
Natural Gas $82,088 15,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Consumption Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $55,391 $74,250 $55,391
1,035,341
kWh
- - -
02 3.4159: Replace treated water with well / surface water $37,920 $18,500 - - - $37,920
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,893 $55,300 $18,893
353,146
kWh
- - -
04 2.1331: Burn a less expensive grade of fuel $13,130 $25,484 - $67,660
-
MMBtu
$(-54,530.0)
-
MMBtu
-
05 2.7224: Reduce space conditioning during non-working hours $3,441 $5,848 $5,315
99,345
kWh
- $(-1,874.0)
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $2,523 $2,000 $2,523
47,158
kWh
- - -
TOTAL RECOMMENDED $131,298 $181,382 $82,122
1,534,990
kWh
$67,660
-
MMBtu
$(-56,404.0)
-
MMBtu
$37,920
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs