Assessment Year | 2002 |
---|---|
Principal Product | Paper Envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
234,000
ft2
|
Annual Production | 3,600,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $671,116 | 12,153,141 |
kWh
|
$0.055 |
Electricity Demand | $409,386 | 26,412 |
kW-mo/yr
|
$15.50 |
Electricity Fees | $92,722 | - |
|
- |
Natural Gas | $182,301 | 15,513 |
MMBtu
|
$11.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $214,877 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $76,232 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $46,658 | $80,500 |
$15,758
275,985
kWh
|
- | $30,900 | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $117,765 | $284,800 |
$75,653
1,324,934
kWh
|
$42,112
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $24,477 | $22,000 | - |
$24,477
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,725 | $46,000 |
$14,725
257,878
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,155 | $13,100 |
$6,155
107,801
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,901 | $7,000 |
$3,901
68,320
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,196 | - |
$1,196
20,948
kWh
|
- | - | |
TOTAL RECOMMENDED | $214,877 | $453,400 |
$117,388
2,055,866
kWh
|
$66,589
-
MMBtu
|
$30,900 | ||
TOTAL IMPLEMENTED | $76,232 | $109,500 |
$20,855
365,253
kWh
|
$24,477
-
MMBtu
|
$30,900 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs