| Assessment Year | 2001 |
|---|---|
| Principal Product | Paper envelopes |
| NAICS |
n/a
|
| SIC | 2677: Envelopes |
| Sales Range | $50 M to 100M |
| # of Employees | 193 |
| Plant Area |
123,200
ft2
|
| Annual Production | 2,340,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $390,230 | 5,562,700 |
kWh
|
$0.070 |
| Electricity Demand | $68,809 | 13,449 |
kW-mo/yr
|
$5.12 |
| Electricity Fees | $821 | - |
|
- |
| Natural Gas | $46,110 | 5,177 |
MMBtu
|
$8.91 |
| Fuel Oil #2 | $7,544 | 1,260 |
MMBtu
|
$5.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,508 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,860 | $45,850 |
$35,860
404,100
kWh
|
- | - | |
| 02 | 2.2437: Recover waste heat from equipment | $17,998 | $40,000 | - |
$17,998
-
MMBtu
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,461 | $6,200 |
$4,461
50,275
kWh
|
- | - | |
| 04 | 2.6242: Minimize operation of equipment maintained in standby condition | $2,510 | $15,000 |
$2,510
28,286
kWh
|
- | - | |
| 05 | 2.1224: Replace boiler | $1,908 | $1,908 | - |
$(-5,652.0)
-
MMBtu
|
$7,560
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,771 | $3,000 |
$1,771
19,952
kWh
|
- | - | |
| TOTAL RECOMMENDED | $64,508 | $111,958 |
$44,602
502,613
kWh
|
$12,346
-
MMBtu
|
$7,560
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs