ITAC Assessment: MA0502
ITAC logo
ITAC Assessment: MA0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Paper envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $50
M
to 100
M
# of Employees 193
Plant Area 123,200
ft2
Annual Production 2,340,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,230 5,562,700
kWh
Electricity Demand $68,809 13,449
kW-mo/yr
Electricity Fees $821 -
Natural Gas $46,110 5,177
MMBtu
Fuel Oil #2 $7,544 1,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,860 $45,850 $35,860
404,100
kWh
- -
02 2.2437: Recover waste heat from equipment $17,998 $40,000 - $17,998
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,461 $6,200 $4,461
50,275
kWh
- -
04 2.6242: Minimize operation of equipment maintained in standby condition $2,510 $15,000 $2,510
28,286
kWh
- -
05 2.1224: Replace boiler $1,908 $1,908 - $(-5,652.0)
-
MMBtu
$7,560
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,771 $3,000 $1,771
19,952
kWh
- -
TOTAL RECOMMENDED $64,508 $111,958 $44,602
502,613
kWh
$12,346
-
MMBtu
$7,560
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs