ITAC Assessment: AS0422
ITAC logo
ITAC Assessment: AS0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Metal doors
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 35,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,794
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,816 420,780
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $577,973 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings By-product Production Savings
01 4.513: Re-arrange equipment layout to reduce labor costs $562,419 $119,490 - $562,419
02 2.7447: Install vinyl strip / high speed / air curtain doors $8,736 $9,000 $8,736
69,613
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $4,763 $33,120 $4,763
37,948
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $231 $13,918 $231
16,963
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,824 - $1,824
13,416
kWh
-
TOTAL RECOMMENDED $577,973 $175,528 $15,554
137,940
kWh
$562,419
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs